Difference between revisions of "Bxp R10SER2 - Time Tracker"

(Created page with "= Overview = This document forms part of the bxp Release 10 Service Enhancement Release 2 suite of changes found here Bxp_Release_10_SER_2_prerelease_notes == Time Tra...")
 
m
 
(2 intermediate revisions by the same user not shown)
Line 8: Line 8:
  
  
=== Scheduling ===
+
=== Layout Change ===
  
  
The output of the scheduling engine will manifest that the hours in Time Tracker will be prefilled with a user having the ability to edit as their day progresses.
+
Some small visual changes have been made to the layout of the Time Tracker historical window to facilitate easier reading.
  
 +
* Firstly two trend lines have been added to easily indicate a 40 hour working week and a 35 hour working week.
 +
* The actual values are now displayed inside the columns
 +
* The date names are shortened and the chart given more space to fully show dates and names
 +
* The size of the buttons below the chart have increases and moved closer to the chart to save on screen space
 +
* An extra button was added to the middle to quickly jump to today's date for data entry.
 +
* Person and current date being edited details have been compressed and combined to save space.
  
Actual scheduling will be done by a new module called Scheduler and the interaction of the output will be supported by Time Tracker.
+
 
 +
 
 +
{| class="wikitable"
 +
|-
 +
!|Was
 +
!|Becomes
 +
|-
 +
||[[File:timetracker_r10ser2_was.png|400px]]
 +
||[[File:timetracker_r10ser2_becomes.png|400px]]
 +
|}
 +
 
 +
 
 +
=== Limit Work Type by Project ===
 +
 
 +
 
 +
This feature means that when a project is selected and it has Work Type filtering enabled, only the work types selected can be chosen from the Work Type list.
 +
 
 +
 
 +
 
 +
=== Fix for Non-Linked Jobs ===
 +
 
 +
 
 +
Extensive additions have been made to the Time Tracker interface to support reporting without the Job Linking engine turned on.
  
  
  
 
[[Category:Topic:bxp Release 10 SER 2]]
 
[[Category:Topic:bxp Release 10 SER 2]]

Latest revision as of 14:53, 26 April 2018

Contents

1 Overview

This document forms part of the bxp Release 10 Service Enhancement Release 2 suite of changes found here Bxp_Release_10_SER_2_prerelease_notes


1.1 Time Tracker 020.png

1.1.1 Layout Change

Some small visual changes have been made to the layout of the Time Tracker historical window to facilitate easier reading.

  • Firstly two trend lines have been added to easily indicate a 40 hour working week and a 35 hour working week.
  • The actual values are now displayed inside the columns
  • The date names are shortened and the chart given more space to fully show dates and names
  • The size of the buttons below the chart have increases and moved closer to the chart to save on screen space
  • An extra button was added to the middle to quickly jump to today's date for data entry.
  • Person and current date being edited details have been compressed and combined to save space.


Was Becomes
timetracker r10ser2 was.png timetracker r10ser2 becomes.png


1.1.2 Limit Work Type by Project

This feature means that when a project is selected and it has Work Type filtering enabled, only the work types selected can be chosen from the Work Type list.


1.1.3 Fix for Non-Linked Jobs

Extensive additions have been made to the Time Tracker interface to support reporting without the Job Linking engine turned on.