=== Scheduling Layout Change ===
The output Some small visual changes have been made to the layout of the scheduling engine will manifest that the hours in Time Tracker will be prefilled with a user having the ability historical window to edit as their day progressesfacilitate easier reading.
* Firstly two trend lines have been added to easily indicate a 40 hour working week and a 35 hour working week.
* The actual values are now displayed inside the columns
* The date names are shortened and the chart given more space to fully show dates and names
* The size of the buttons below the chart have increases and moved closer to the chart to save on screen space
* An extra button was added to the middle to quickly jump to today's date for data entry.
* Person and current date being edited details have been compressed and combined to save space.
Actual scheduling will be done {| class="wikitable"|-!|Was!|Becomes|-||[[File:timetracker_r10ser2_was.png|400px]]||[[File:timetracker_r10ser2_becomes.png|400px]]|} === Limit Work Type by Project === This feature means that when a new module called Scheduler project is selected and it has Work Type filtering enabled, only the work types selected can be chosen from the interaction of Work Type list. === Fix for Non-Linked Jobs === Extensive additions have been made to the output will be supported by Time Trackerinterface to support reporting without the Job Linking engine turned on.
[[Category:Topic:bxp Release 10 SER 2]]