Report Library - Scheduled Reporting

1 byte added, 16:02, 14 April 2015
no edit summary
Due to the expansion of the bxp scheduling engine, bxp now allows for the creation of scheduled reports. This article will show you how to create a scheduled report, update an existing scheduled report and then access/download the reports generated by the bxp scheduling engine.
There There are however three conditions that must be met before you can schedule a report, bxp will not allow scheduled reporting if the following three cases:
1) The report to be scheduled in is not a customised group
2) The Required required reporting time from is set to start in the past
3) The required report generate time is between 23:00 and 07:00 ''( this time is set aside for the bxp backup and maintenance scheduled routines )''