Difference between revisions of "QA Planning Discussions"

 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
 
* Conduit
 
* Conduit
 
* eircom | meteor
 
* eircom | meteor
 +
* FEXCO
 
* PaddyPower.com
 
* PaddyPower.com
 
* Rigney Dolphin
 
* Rigney Dolphin
Line 9: Line 10:
  
 
[[File:Project_-_Quality_Assurance_v1-3.pdf]]
 
[[File:Project_-_Quality_Assurance_v1-3.pdf]]
 +
 +
[[Category:Topic:About bxp]]
 +
[[Category:Topic:Strategy]]
 +
[[Category:Topic:Quality Assurance]]
 +
[[Category:Module Specific:Quality Assurance]]
 +
[[Category:Module Specific:Form Management]]

Latest revision as of 23:47, 9 November 2014

Quality Assurance planning discussions were done with the aid of experts from (in alphabetical order)

  • Conduit
  • eircom | meteor
  • FEXCO
  • PaddyPower.com
  • Rigney Dolphin

From discussions with their QA teams the following presentation was developed to address their raised collective requirements.


File:Project - Quality Assurance v1-3.pdf