== Creating a scheduled report==
+
== Creating a scheduled report ==
  
 
In order to schedule a report inside bxp you must first navigate the following system path
 
In order to schedule a report inside bxp you must first navigate the following system path
  
''Main Menu > Report Library > Report Library - Administration > Schedule a Customised Report
+
''Main Menu > Report Library > Report Library - Administration > Schedule a Customised Report''
''
 
  
 
[[File:ScheduledReports_Create.png]]
 
[[File:ScheduledReports_Create.png]]
Line 75: Line 74:
  
  
 +
== Editing a Scheduled Report ==
  
  
 +
In order to edit a scheduled report inside bxp you must first navigate the following system path
  
 +
''Main Menu > Report Library > Report Library - Administration > Edit a Scheduled Customised Report''
  
 +
[[File:ScheduledReports_Edit.png]]
  
 +
Once you have navigated the above system path you will be presented with a List of all the forms in the system that you have access to. You must chose the form that the
 +
existing scheduled report is attached to, after doing this you will be presented with a list of all the scheduled reports attached to the selected form. Simply select the scheduled
 +
report that you wish to modify and click the ''Select'' button at the bottom of the page:
  
  
 +
[[File:ScheduledReports_SelectEdit.png.png]]
 +
 +
 +
After selecting the scheduled report that you wish to modify, you will be presented with the ''Edit a Scheduled Report Page'', this page has the exact same layout and fields as the ''Add a Scheduled Report Page''
 +
except that all of the fields are pre populated with the current settings. Simply make your changes to the scheduled report settings and click the ''Schedule the report'' button
 +
 +
 +
 +
== Accessing/Downloading a Scheduled Report ==
  
  

Revision as of 15:31, 14 April 2015

1 Overview

Due to the expansion of the bxp scheduling engine, bxp now allows for the creation of scheduled reports. This article will show you how to create a scheduled report, update an existing scheduled report and then access/download the reports generated by the bxp scheduling engine.

There are however three conditions that must be met before you can schedule a report, bxp will not allow scheduled reporting if the following three cases:


1) The report to be scheduled in not a customised group

2) The Required reporting time from is set to start in the past

3) The required report generate time is between 23:00 and 07:00 ( this time is set aside for the bxp backup and maintenance scheduled routines )


2 Creating a scheduled report

In order to schedule a report inside bxp you must first navigate the following system path

Main Menu > Report Library > Report Library - Administration > Schedule a Customised Report

ScheduledReports Create.png


Once you have navigated the above system path you will be presented with a List of all the forms in the system that you have access to. You must chose a form to generate the report against, After selecting the desired form you will be redirected to the Scheduled Report page.


Once here you will have a number of options on screen, you must fill in the entire form as instructed below to ensure you have scheduled the customised report correctly. The fields on the form are as follows:


1) Scheduled Report Name

This field should contain a unique identifiable name for the report you wish to schedule

2) Report Group To Schedule

This field should be the customised reporting group that you wish to use when generating the data

3) Start Date/Time For The Report

This field should contain the date and time you wish for the scheduled report generation to start

4) Last Date/Time Of Generation

This field is system controlled and contains the last date and time the scheduled report was generated

5) Next Date/Time For Generation

This field is system controlled and contains the next date and time the scheduled report is due to generate

6) Report Generation Frequency

This field should contain the desired reporting frequency i.e. How ofter do you want the scheduled report to generate. There are five frequencies available
1) Daily ( Generate once every day )
2) Weekly ( Generate once every 7 Days )
3) Monthly ( Generate once every Month )
4) Yearly ( Generate once every Year )
5) Hourly ( Generate once every hour )

7) Report Data Capture Period

This field should contain the date range option that you wish to include data from in you scheduled report, there are four date ranges available
1) All ( Include All Data )
2) Current Year ( Include data from the current Year )
3) Current Month ( Include data from the current Month )
4) Current Day ( Include data from the current Day )
5) MetaData Delta ( Include all new data i.e. Data capture between the last time the scheduled report was generated and the current execution )


ScheduledReports Main Add.png


3 Editing a Scheduled Report

In order to edit a scheduled report inside bxp you must first navigate the following system path

Main Menu > Report Library > Report Library - Administration > Edit a Scheduled Customised Report

ScheduledReports Edit.png

Once you have navigated the above system path you will be presented with a List of all the forms in the system that you have access to. You must chose the form that the existing scheduled report is attached to, after doing this you will be presented with a list of all the scheduled reports attached to the selected form. Simply select the scheduled report that you wish to modify and click the Select button at the bottom of the page:


File:ScheduledReports SelectEdit.png.png


After selecting the scheduled report that you wish to modify, you will be presented with the Edit a Scheduled Report Page, this page has the exact same layout and fields as the Add a Scheduled Report Page except that all of the fields are pre populated with the current settings. Simply make your changes to the scheduled report settings and click the Schedule the report button


4 Accessing/Downloading a Scheduled Report