Difference between revisions of "QA Planning Discussions"
From All n One's bxp software Wixi
Philip Lacey (talk | contribs) (Created page with "Quality Assurance planning discussions were done with the aid of experts from (in alphabetical order) * Conduit * eircom | meteor * PaddyPower.com * Rigney Dolphin From discu...") |
Philip Lacey (talk | contribs) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
* Conduit | * Conduit | ||
* eircom | meteor | * eircom | meteor | ||
| + | * FEXCO | ||
* PaddyPower.com | * PaddyPower.com | ||
* Rigney Dolphin | * Rigney Dolphin | ||
From discussions with their QA teams the following presentation was developed to address their raised collective requirements. | From discussions with their QA teams the following presentation was developed to address their raised collective requirements. | ||
| + | |||
| + | |||
| + | [[File:Project_-_Quality_Assurance_v1-3.pdf]] | ||
| + | |||
| + | [[Category:Topic:About bxp]] | ||
| + | [[Category:Topic:Strategy]] | ||
| + | [[Category:Topic:Quality Assurance]] | ||
| + | [[Category:Module Specific:Quality Assurance]] | ||
| + | [[Category:Module Specific:Form Management]] | ||
Latest revision as of 23:47, 9 November 2014
Quality Assurance planning discussions were done with the aid of experts from (in alphabetical order)
- Conduit
- eircom | meteor
- FEXCO
- PaddyPower.com
- Rigney Dolphin
From discussions with their QA teams the following presentation was developed to address their raised collective requirements.