399
edits
Changes
no edit summary
There are however three conditions that must be met before you can schedule a report, bxp will not allow scheduled reporting if the following three cases:
1) The report to be scheduled in not a customised group
2) The Required reporting time from is set to start in the past
3) The required report generate time is between 23:00 and 07:00 ''( this time is set aside for the bxp backup and maintenance scheduled routines )''
In order to schedule a report inside bxp you must first navigate the following system path
''Main Menu > Report Library > Report Library - Administration > Schedule a Customised Report''
[[File:ScheduledReports_Create.png]]
Once you have navigated the above system path you will be presented with a List of all the forms in the system that you have access to. You must chose a form to generate the report against,
After selecting the desired form you will be redirected to the ''Scheduled Report'' page.
Once here you will have a number of options on screen, you must fill in the entire form as instructed below to ensure you have scheduled the customised report correctly. The fields on the form
are as follows:
1) Scheduled Report Name